No Donor # Ref Year Duration Location Activity Project Status
238 OXFAM/GB   2011-2012   Badakhshan Emrgency Response Project On-going
237 OXFAM GB   2011   Badakhshan Jawzoon Assessment Survey Completed
236 FAO   2011-2012   Takhar Wheat seed& fertilizer distribution porject On-going
235 FAO   2011-2012   Faryab & Jawzjan Animal Feed Distribution Project On-going
234 FAO   2010-2011   Takahr Wheat seed, fertilizer, seed silo, vegetable. seed distribution porject completed
233 GIZ/DCA   2010-2011   Takhar, Baghlan, Kunduz Livestock Extension On-going
232 GTZ/SPF Mazar   2009-2010   Andkhoi, Faryab Livestock Manmagement Training Completed
231 FAO   2009-2010   Lawlash, Gurzewan Pastoonkut-Faryab Wheat seed & Fertilizer Distribution On-going
230 OXFAM GB    2009 - 2010   Argo & Yawan, Badakhshan Water supply, Sanitation, health promotion, Food security Completed
229 PRT Panjshir   2009   Dara, Panjshir Honey Beekeeping Training (continuation of No.223) Completed
228 IDRF Canada   2009-2010   Kabul & Balkh 1. Carpentry Training             2. Carpet Weaving                On-going
227 FAO   2009   Faryab Distribution of Animal Feed & Comm. Development On-going
226 FAO   2009   Balkh and Jawzjan Distribution of Animal Feed & Comm. Development Completed
225 ASAP / DCA   2009   Baghlan, Takahr, Kunduz Cashmere Harvesting campaign Completed
224 ARD/USAID   2008- 09   Paryan , Panjshir Livestock Development, Dairy Goats Completed
223 ARD/USAID   2008- 09   Dara, Panjshir Honey Beekeeping Training and Equipment Completed
222 ARD/USAID   2008- 09   Tala Barfak, Baghlan Honey Beekeeping Training and Equipment Completed
221 ARD/USAID   2008- 09   Baghlan Jadid  Carpet Weaving, Basic Business and Marketing Training Completed
220 ARD/USAID   2008- 09   5 Districts, Baghlan  Basic Literacy and Numeracy Training Completed
219 ASAP/DCA   2007   Baghlan, Takahr, Kunduz Cashmere Harvesting Project Completed
218 FAO   2007   Panjshir Wheat seed and Fertilizer Distribution and Com. Dev. Project in Rukha and Anaba Complete
217 FAO   2007 Dec.00 Balkh Province Livesstock Management Training in Balkh, Sholgar and Charbolak districts Completed
216 ASAP/USAID   2007- 2010   Kunduz,Baghlan, Takhar Animal Health program Completed
215 COIN/IDRF   2007   Andkhoi Carpet Weaving pilot project  Completed
214 FAO   2006   Takhar, Badakhshan Wheat Seed and Fertilizer distribution and com Dev Micro-projects Completed
213 L.B.G./ USAID   2006   Kabul Roof Retrofit of MoPH Training Center Completed
212 DCA/RAMP/ USAID   2006   Parwan Construction of hostel for veterinary trinees Completed
211 PADCO/USAID   2006   Badakhshan Animal health livestock porduction   Completed
210 PADCO/USAID   2006   Badakhshan Construction of Dargaw Diversion in jurm Completed
209 DCA/Dutch Embassy   2006   Baghlan Livestock program in Baghlan (Extension,Cattle,Sheep,poultry, Cooperative Components) Completed
208 IDRF Canada   2005   Andkhoy Reconstruction of Shah Mardan Mosque Completed
207 PADCO/USAID   2005   Badakhshan Survey and selection of candidates for paravet traning Completed
206 RAMP/ USAID   2005   Balkh Rehabilitation of Sholgar road, Balkh Completed
205 RAMP/ USAID   2005   Kunduz Detail survey and design of Kunduz roads in Kunduz Completed
204 DCA/PRT   2005   Baghlan Poultry program Completed
203 FAO   2005   Faryab,Kunduz distribution of wheat silos Completed
202 Embassy of Japan   2005   Balkh,Balkh province Construction of Ilqaichi School Completed
201 Embassy of Japan/ JICA   2004 Dcm.22,04 Shiberghan, jawzjan Construction of  Vocatioal Training Center Completed
200 DCA     2004 7/10/2004 Charikar / Parwan Charikar Live Stock Center Completed
199 RAMP/ USAID   2004   Kunduz Construction of Secondry Roads  Imam Sahib Road  On-going
198 Japan Embassy   2004 Nov.8,04 Chemtal, Balkh District/ Balkh Furniture of 4 Schools On-going 
197 Japan Embassy   2004 Oct.17 2004 Shast, Dashtak /Panjshir  Furniture for Shast & Dashtak Schools Completed
196 UNODC   2004 Oct.26,04 Faizabad/ Badakhshan Construction of CNPA Building On-going 
195 FAO   2004 2004-2005 Faryab, Jawzjan, Sare Pul, Balkh Wheat Seed and Fertilizer distribution On-going
194 DCA/RAMP/ USAID   2004 April 1,04 Kunduz, Baghlan, takhar, BDN Live Stock Health , Production  and Marketing Improvement  On-going 
193 CHF/USAID   2004 Aug.5,04- Bevekan, Badakhshan Cnostruction of Neswan School  On-going
192 CHF/USAID   2004 1/8/04- Bevekan, Badakhshan Reconstruction of New Neswan Baharak School On-going
191 CHF/USAID   2004 1/8/04- Sari Shar, Badakhshan Reconstruction of Sari Shar School  Completed
190 CHF/USAID   2004 1/8/04- DoAb Shewa, Badakhshan Construction of Clinic DoAb Sheghnan On-going
189 Japan Embassy   2004 1/8/04- Imam Sahib, Chemtal, Balkh Rehabilitation of Imam Sahib Canal  Completed
188 Shelter for Life   2004 2004 Kabul Rehabilitation of Zarghoona  Girls School Completed
187 Japan Embassy   2004 2004 Balkh Construction of Shinkai Scool, Balkh   Completed
186 Japan Embassy   2004 2004 Balkh Construction of Katorai School, Balkh  Completed
185 Japan Embassy   2004 2004 Balkh Reconstruction of Imam Sahib Scool, Chemtal   Completed
184 Japan Embassy   2004 2004 Balkh Construction of Asiab Sharaf School, Chemtal   Completed
183 Japan Embassy   2004 2004 Parwan Construction of Dashtak Scool  Completed
182 Japan Embassy   2004 2004 Parwan Construction of Shast School for  Completed
181 FAO   2003-   Chardehi/ Kabul Wheat seed & Fertilizer  Completed
180 Chemonics/    RAMP   2003 November Parwan Agricultural PRA Completed
179 UN Habitat   2003-2004   Kabul Construction of Beni Hsar School completed
178 Chemonics /RAMP    2003 August Kunduz  Agricultural PRA Completed
177 L.B.G./ USAID   2003-2004    Faryab  Construction of 9 Schools:                         1. Pakhal Soz                2. Jar Qala                     3.Qutur                           4.Chaghatak                  5.  Ghalbian                    6.Dahmeran                   7.Hematabad                 8.Dara Shakh                 9.Said Rajab                            Completed
176 CIDA/IDRF   2003-2006 Sep.03-Sep06 kabul Women Development Program: 1.Carpet Weaving Training 2.Embroidery 3.Tailoring 4.Leather works 5.Jewelery 6.Flower making 7.Knitting 8.Basic Literacy 9.Basic Health Education Completed
175 FAO /WRI   2002/ 03 12/16/2002 7 Villages Kunduz, 24 villages Balkh Reconnaissance and Project Identification Surveys Completed
174 CIDA/IDRF   2002 /2004 2002/2004 Alburz ,Balkh & Andkhoi, Faryab  Drought Assistance Project in the North Completed
173 ACTION AID   2003 Apr.- Dec. Aibak,Samangan Community Participatory Change Plans in North Completed
172 ACTION AID   2002 oct-Nov Alburz, Balkh Fertilizer Distribution & Wheat Seed Completed 
171 Chemonics AQIP   2003 Oct. 02- Mar. 03 Istalif, Kabul Karez Cleaning Completed
170 Chemonics AQIP   2003 Oct. 02- Oct. 03 Istalif, Shakardar,  &Kalakan,Kabul Poultry program Completed
169 Chemonics AQIP   2003 Feb-Oct. 03 Guhlbahar, Kabul Flood Protection Completed
168 Chemonics AQIP   2003 Oct. 02- Feb. 03 Istalif, Kabul Khuja Hassan Canal Completed
167 Chemonics AQIP   2003 Oct. 02- Oct. 03 kalakan & Istalif, Kabul Shamali Integrated Project Completed
166 Chemonics   2003 Apr.- Oct. Char Dehi, Kabul Drip Irrigation  Completed
165 Chemonics AQIP   2003 Oct. 02- Oct. 03 Kalakan& Istalif ,Kabul Incom Generation Program, Shamali Completed
164 FAO   2002 /2003 Oct. 02- Oct. 03 Puli Alam, Khushi Mohd Agha, Charkh& Barake Barak, Logar Wheat Seed and Fertilizer distribution Completed
163 UNOPS   2002 8/4/02 15/2/03 Center of Kabul Mirbacha Kot District Office Completed
162 URF/KFW E-029 2002 6/17/02 29/3/03 Istalif, Kabul Reconstruction of Yaqub Shaheed Middle School Completed
161 URF/KFW E-028 2002 24/6/02 24/3/03 Istalif, Kabul Reconstruction of high School, Istalif Completed
160 ICARDA/ IFDC   2002 10/1/2002 Sakardara, Chardi, Farza, Istalif, and Guldara,kabul Fertilizer Distribution & Wheat Seed Completed
159 IRC   2002 25.9.02 Balkh Colllecting and Distribution of Wheat Seed In Albuz  Completed
158 FAO   2002 31.5.02 Badakhshan Cleaning of Sang more Canal, Faizabad Completed
157 UNOCHA/ WFP   2002 15.3.02 Badakhshan Faizabad Town Road  Completed
156 IDRF Canada   2002 16.2.02 Kabul Istalif Integrated Rehabilitation Project  Completed
155 PNF   2002 6/1/02 5/2/02 Balkh Distribution of Suplimintry Food ,Zari Completed
154 IRC   2002 5/8/02 20/8/02 Balkh Distribution of Suplimintry Food , Zari Completed
153 IRC   2002   Balkh Improvement of 40 Kanda in Alburz district Completed
152 IRC   2002   Balkh Kanda ( water resourses) Construction in Zari district  Completed
151 IRC   2002   Balkh Constrution of Earthen Dams ( Qaaq ) in Alburz Completed
150 IRC   2001 11/12/01 10/5/02 Balkh Food Distribution in Balkh Province Zari  Completed
149 IRC   2001 11/12/01 10/5/02 Balkh Food Distribution in Balkh Province Marmol  Completed
148 UNOCHA/ WFP   2001 15.11.01 Badakhshan Rehabilitation of Dashte Farakh canal, Badakhshan Completed
148 NCA   2001 1/11/01 6/2/02  Faryab  Appeal for emergency response to drought in northern region  (Faryab ) Completed
147 IDRF Canada   2001 1/9/01 30/6/02 Balkh Construction of 20 Semi-deep wells and food distribution  Completed
146 FAO   2000 1.1.00 Kabul Integrated dairy developmet project in kabul Completed
145 UNOCHA/ WFP   2001 1/8/01 31/3/02 Badakhshan Faizabad Drought Assistance Completed
144 UNDCP   2002 1/5/02 20/5/2   Poppy Survey in Northern Provinces Completed
143 AWO     1.1.02 Peshawar Assistance to Afghan Refugees Children Educated in Peshawar  On-going 
142 Private   2002- 2006   Kabul Bee keeping program Completed
141 CIDA/IDRF   2000 1/5/00-1/1/01 Kabul Re-establishing Traditioal Livelihood in Kabul            (a)Education (b)Beekeeping© Sericulture          Completed 
140 FAO PRB/00/02/ TCP 2001 Jan.2001 Northen provinces Progressive control pf major trans-boundary animal dieases Completed 
139 Japan Embassy   2001 Feb.00 Kabul Recosntruction of Rahman Mina Clinic Completed 
138 FAO PRB/00/196/ VT 2000 Dec.00 Northen provinces District vererniry services in Afghnistan  Completed 
137 UNOCHA AZ/ZTQ-6/ 017/PRB-4 2000 Oct.00 Badakhshan  EmergencyRehabilitation of Bahrak-Jurm road Completed 
136 UNOCHA   2000 Aug. 00        Badakhshan Emergency repair of Faizabad airport Completed 
135 UNOCHA  AX/ZTQ-6/ 017/PRB-3 2000 Aug. 00        Takhar Water supply in relocated villages affected by Rustaq/ Takhar Completed 
134 UNDP   2000 Jan.00         Takhar Monitoring UNDP Projects in Takhar Completed 
133 UNDCP C-27/BDK/  PRB /014 2000 May.00  North 5 provinces Poppy survey in 5 provinces Completed 
132 UNDCP C-27/BDK/  PRB /013 2000 May.00 Badakhshan& Takhar Poppy survey in Badakhshan & Takhar Completed 
131 FAO PRB/2000/191/ LP 2000 Jul.00 Kabul   Dairy Development Phase III Completed 
130 FAO PRB/2000/162/ PM 2000 Jan.00 Jun.00 Central Provinces Technical services for the development of livestock production in Afganistan  Completed 
129 FAO PRB/00/178/ VT 2000 1.1.00 47Clinics District Veterinary Services Completed 
128 FAO PRB/00/171/ VT 2000 1.1.00 3 Clinics District Veterinary Services Completed 
127 FAO PRB/99/145 /LP 1999 1.7.99 31.12.99 Kabul city Dairy development Completed 
126 UNOCHA/ UNDP/WFP   1999 1.8.99 30.10.99 Shari Buzurg/Badakhshan  Shelter rehabilitation of several villages Completed 
125 FAO PRB/98/PM/01 1999 1.1.99 30.6.99 North& Central Afghanistan  Technical services for the development of livestock production in Afganistan  Completed 
124 AWO    1999 Mar.99          NWFP Assistance for education of vulnerable Afgan's Children Completed 
123 AWO    1999                     Kabul city Carpet Weaving pilot project  Completed 
122 PRB   1999 1.1.99           Kabul city Agriculture demonstrative plots on farmers farms Completed 
121 PRB   1999 1.1.99          Kabul city Wheat seed multiplication/ production project  Completed 
120 PRB   1999 1.1.99          . Kabul city Bakery monitoring Completed 
119 WFP   1999 1.11.99 Jul.00 Kabul city Bakery monitoring Completed 
118 WFP   1999 1.10.99 31.10.99 Kabul city Bakery monitoring Completed 
117 WFP   1999 1.9.99 30.9.99 Kabul city Bakery monitoring Completed 
116 WFP   1999 1.6.99 30.8.99 Kabul city Bakery monitoring Completed 
115 UNOPS   1999   Faizabad/ Badakhshan Construction of Woring school Completed 
114 WFP   1999 1.1.99 30.5.99 Kabul city Bakery monitoring Completed 
113 FAO PRB/97/01 1999 1.1.99         6 Provinces District based veterinary services Completed 
112 FAO PRB/LP/89 /01 1999 1.1.99 Kabul city Dairy development Completed 
111 UNDCP/ UNOPS C27/NGR/NDC/ 007 1999 10.4.99 30.4.99 5 District / Badakhshan Poppy variety survey Completed 
110 WFP   1999 4month Jalalabad city Bakery monitoring  Completed 
109 UNOPS/ ARR AFG/96/003/ MZR/PRB /486 1999 6month Kishm, Faizabad/ Badakhshan Monitoring/ inspection of UNOPS/ARR sub-project Completed 
108 UNDCP/ UNOP C27/BDK/PRB/Jan-00 1999 3month BDN,Balkh,Takhar, Kunduz&Jouzjan Poppy survey Completed 
107 UNOCHA/  UNDP/WFP AX/ZTQ/6/017/ PRB 1999 3month Zardev/ Badakhshan Emergency rehabilitation of Nahr-e-Kalan Completed 
106 UNOPS AGG/96/003/ MZR/CDA /324 1999 2.5 Month Faizabad/ Badakhshan Rehabilitation of intake and canal in Dan-e- Aow Completed 
105 Private   1999   kabul Cooperative developpment in Afganistan (extension) Completed 
104 Private PRB/AG/113 1998 Oct.98 Aug.98 Chardehi/ Kabul Improved wheat seed distibution  Completed 
103 UNOCHA/ UNDP/WFP   1998 Oct.98 Dec.98 Shari Buzurg/ Badakhshan Shelter rehabilitation of several villages Completed 
102 WFP   1998 Sep.98 Dec.98 Kabul Kabul bakeries monitoring program Completed 
101 KJRC/ WFP   1998 Sep.98 Dec.98 Shari Buzurg/ Badakhshan Shelter rehabilitation Khurdakan village Completed 
100 FAO PRB/PM/98 /01 1998 Jul.98 Kabul,Kandahar &Badakhshan Technical services for the development of livestock production in Afg. Completed 
99 UNOCHA AZ/ZTQ/6/017/ PRB 1998 Aug.98 Dec.98 Jurm/ Badakhshan Rehabilitation of Sajal canal Completed 
98 UNDCP   1998 Jun.98 Aug.98 Mazar,  Bdakhshan Poppy cultivation survey Completed 
97 WFP   1998 May.98 Aug.98 Kabul Kabul bakeries monitoring program Completed 
96 UNOPS   1998 May/97 Jul.98 Faizabad/ Badakhshan Zafarabad drinking water reservoir Completed 
95 UNOPS   1998 May.98 Jul.98 Faizabad/ Badakhshan Rehabilitation of Layaba canal Completed 
94 Private   1998 Aug.98 Dec.98 Kabul Multi sectoral product farm for development of agriculture Completed 
93 Private PRB-Ag/110 1998 Jan.98 Dec.98 Kabul Distribution of wheat seed in district 7 Completed 
92 Private PRB-Ag/109 1998 Jan.98 Dec.98 Kabul Forest Nursery program Completed 
91 Private   1998 Jan.98 Dec.98 Kabul Bee keeping program Completed 
90 FAO   1998 May/97 Dec.98 Six provinces District based veterinary services Completed 
89  ACBAR/ WFP   1998 Jan.98   Ari.98 Kabul Kabul bakeries monitoring program Completed 
88 IRC   1997 10.11.97 3.8.97 Pul-e-matak/ Jabul Siraj Reconstruction Siphon, Parwan canal Completed 
87 Private donor PRB-AG/110 1997 8month Deh Murad Khan District7 Wheat seed multiplication& Abas khel canal Completed 
86 Private donor PRB-AG/108/96 1997 3years  Macro Rayan/ kabul Multi sectoral product farm for development of agriculture Completed 
85 RAP/EU EU-14-97 1997 1.7.97    30.10.97 Khoja Omari Rehabilitation of Chachi&Binisang canal Completed 
84 RAP/EU EU-14-96 1997 15.6.97    31.12.97 Hazrat Sultan / Samangan Rehabilitationf of Dulkhaki&Kokjar irrigation canal Completed 
83 UNDCP   1997 1.4.97 16.4.97 Faizabad/ Badakhshan Ground Assisment of poppy cultivation  Completed 
82 UNDCP   1997 1.4.97         16.4.97 Balkh/Chmtal/ Balkh Ground assisment of poppy cultivation  Completed 
81 FAO/UNDP PRB/97/001 1997 1.5.97           31.12.98 6 provinces District veterinary serives in Afghanistan (extension) Completed 
80 FAO PRB/-96/01 1997 1.1.97         30.4.97 6 provinces District veterinary serives in Afghanistan (extension) Completed 
79 WFP   1997 4m kabul Monitoring of kabul bakeries  Completed 
78 WFP   1997 4m Kabul Monitoring of kabul bakeries  Completed 
77 WFP   1996-97 4m Kabul Monitoring of kabul bakeries  Completed 
76 Private donor PRB/Agr/97 1997 1.1.97    30.12.99 Kabul Forest Nursery Completed 
75 DHSA/EU   1996 4m Gulbahar/ Kapisa Rehabilitation of khuram canal Completed 
74 DHSA/EU   1996 4m Gulbahar/ Kapisa Construcrtion Jabul Siraj Gulbahar road Completed 
73 FAO/WFP   1996 3month Faizabad/ Badakhshan Cosntruction comprehensive VFU Completed 
72 WFP   1996 30.11.96 Kabul city Monitoring of kabul bakeries  Completed 
71 Merlin   1996 15.11.96    15.12.96 Baharak Badakhshan Repairment of Baharrak comprehensive BHU Completed 
70 WFP   1996 1.8.96 Kabul city Monitoring of kabul bakeries  Completed 
69 PRB/Private donor PRB/Agr/107 /96 1996 3 Years Macro Rayan/ Kabul Multi sectoral product farm for development of agriculture Completed 
68 PRB/Private donor PRB/Agr/107 /96 1996 25-3-96        1-10-96 Shakardara/ Kabul Wheat seed multiplication Completed 
67 WFP   1996 25.5.96 Serobi Monitoring of bakeries project Completed 
66 WFP   1996 11.5.96 Paghman Monitoring of bakeries project Completed 
65 WFP   1996 6-4-96      31-7-96 Logar Monitoring of bakeries Completed 
64 WFP   1996 1-6-96         16-8-96 Kabul Monitoring bakeries Afghan Woment High Association Completed 
63 FAO  PRB/96/001 1996 1 year 6 provinces Costructon of VFU building Completed 
62 UNOPS AFG/94/001 JAL/PRB/269 1996 3month   Rehabilitation of Ata Khel and Abas Khel canal Completed 
61 Canada Fund 39-3-216 1996 4month   Sultan Razia girls school Repair project Completed 
60 IRC/ EU G-20-96 1996 3month   Rehabilitation of Jabha canal Completed 
59 FAO/ UNDP PRB/96/001 1996 1 year   District based veterinary services(55 vet. Clinics) Completed 
58 WFP   1995 21-11-95 11-7-96   Monitoring of bakeries project   Completed 
57 WFP   1995 22-11-95 25-7-96   Monitoring of bakeries project   Completed 
56 WFP   1995 6month   Monitoring of bakeries project   Completed 
55 WFP   1995 5month   Monitoring of bakeries Projec  Completed 
54 UNDCP AFG/89/580/ PRB/DCP/81 1995 3month   Construction of Raabat foot-bridge Completed 
53 UNDCP AFG/89/580/ PRB/DCP/180 1995 3month   Construction of Bagh-e-Mubarak foot-bridge Completed 
52 UNDP/ OPS AFG/94/001 MZR/14 1995 3month   Construction of water reservoir Completed 
51 WFP   1995 2moth   Monitoring of bakeries project in Kabul Phase I Completed 
50 Canada Fund   1995 3month   Repariment of Makhfi girls high school Completed 
49 FAO/ UNDP PRB/95/001 1995 12month Paktia,Paktika, Khost,Parwan, Kapisa,Badakhshn District based veterinary services Completed 
48 UNICEF/ WFP AFG/3/94031/080 W/UNICEF 1994 2month Sarshai camp/ Ningarhar Sanitation Completed 
47 UNDCP   1994 2moth Faizabad/ Badakhshan Reconstruction of Makhfi high school (1st part) Completed 
46 UNDCP AFG/88/001/ PRB/APP/160 1994 2moth Safaidbandan, Bahrak/ Badakhshan Constraction of foot-bridge Completed 
45 UNDCP AFG/89/580/ PRB/DCP /100 1994 9month Jurm/ Badakhshan Constraction of Khash girls primary school Completed 
44 UNDCP AFG/89/580/ PRB/DCP /094 1994 3.5month Argo-Faizabad/ Badakhshan Constrution of BHU Completed 
43 UNDCP AFG/89/580/ PRB/CEP/138 1994 2.5month Baharak/ Badakhshan Rehabilitation of Rabat and Kazdeh canals Completed 
42 UNDCP AFG/89/580/ PRB/DCP/120 1994 3month Jurm/ Badakhshan Drug awareness program Completed 
41 UNDCP AFG/88/001/ PRB/DCP/120 1994 3month Faizabad/ Badakhshan Rehabilitation of Omchian canal Completed 
40 UNDP/ OPS AFG/88/001/ PRB/APP/466 1994 3.5month Jaji Maidan/ Khost Advance road rehabilitation training Completed 
39 UNDCP AFG/89/580/ PRB/CDP /113 1994 2.5month Baharak/ Badakhshan Rehabilitation of Khinji canal Completed 
38 UNDP/ FAO PRB/94/001 1994 6month 7 provinces Animal health livestock porduction pro. for Afg. Completed 
37 UNDCP AFG/89/580/ PRB/CDP /098 1994 2.5 Months Zebak/ Badakhshan Rehabilitationof Khulkhan canal Completed 
36 UNDCP AFG/89/580/ PRB/DCP /092 1994 3 Months Gazan,Faiz./ Badakhshan Construction of BHU-II Completed 
35 UNDP AFG/88/001/ PRB/APP/452 1994 2.5 Months 15 provinces Vet. phamaceutical business management course Completed 
34 FAO KAP/CPA/PRB/ 04/93 1993 8 Months Kohistan/ Kapisa Wheat seed, fertilizer distribution porject Completed 
33 FAO PAR/CPA/PRB/ 01/93 1993 8 Months Jabul Saraj/ Parwan  Wheat seed, fertilizer distribution porject Completed 
32 UNDCP AFG/89/580/ PRB/DCP /078 1993 4 Months Faizabad/ Badakhshan Rehabilitation of Emtala canal Completed 
31 UNDCP AFG/89/580/ PRB/DCP /053 1993 5 Months Faizabad/ Badakhshan Construction of boys primary school Completed 
30 Canada Fund   1993 4 Months Jabul Saraj/ Parwan  Construction of boys primary school Completed 
29 UNDP AFG/88/001/ PRB/APP/357 1993 12 Months Eight provinces District based veterinary services Completed 
28 UNHCR/ RAP G# 04-93 1993 3 Months Mandozai/ Khosht Rehabilitation of Shadal, Mulgai&Hassan Zai canals Completed 
27 UNHCR/ RAP G# 03-93 1993 3 Months Mohd Agha/ Logar Recon. of rural road between Pul Qandari-Zaidabad Completed 
26 USAID/ RAP G# 98-93 1993 8 Months Mazari-Sharif /Balkh Corn seed multiplication & demonstration farm Completed 
25 USAID/ RAP G# 97-93 1993 5 Months Aibak&Hazart Sultan/Saman. Rehabilitation of Chawghai&Karez canals Completed 
24 USAID/ RAP G# 95-93 1993 4 Months Khulm/ Samangan Reha. of Char Nakhoon & Hasht Nakhoon canals Completed 
23 UNDCP AFG/89/580 PRB/DCP /038 1993 6 Months Faizabad/ Badakhshan Construction of Basic Health unit phase I Completed 
22 UNDCP AFG/89/580 PRB/DCP/037 1993 6 Months Faizabad/ Badakhshan Construction of boys primary school Completed 
21 UNDP/ FAO GAC/APP/ 280 1993  9 Months Khogyani/ Nangarhar Distribution of Chickens Completed 
20 UNDP/ FA0 PRB/ 92/03 1993 8 Months Khogyani/ Nangarhar Rice seed distribution project Completed 
19 UNDP/ FAP PRB/ 93/05 1992 8 Months Sorkhrod/ Nanagarhar Rice seed distribution project Completed 
18 UNDCP AFG/89/    PRB/ DCP/034 1992 3 Months Faizabad/ Badakhshan  Rehabilitationof Sum Dara canal Completed 
17 Canada Fund    1992 3 Months Panjshir/ Kapisa Rehabilitaton of Mir canal Completed 
16 UNDP/ FAO PRB/92/13 1992 8 Months kolangar/ Logar Wheet seed distribution project Completed 
15 UNDP/ FAO PRB/92/10 1992 9 Months Sorkhrod/ Nangarhar Wheet seed distribution project Completed 
14 USAID/ RAP G # 72-92 1992 8 Months Parwan/ Kapisa Corn seed multiplication project Completed 
13 USAID/ RAP G # 71-92 1992 8 Months Taloqan/ Takhar Establishment of rice seed multiplication project Completed 
12 UNDCP AFG/89/580 / PRB/DCP /026 1992 3 Months Faizabad/ Badakhshan Rehabilitation of Khandan Shar canal Completed 
11 UNDP AFG/88/001 SEN/APP/152 1991 22 Months Seven provinces Village baded veterinary program Completed 
10 Canada Fund    1991 3 Months Jabul Saraj/ Parwan Rehabilitation of Gulbahar-Sayed Khil road Completed 
9 UNDP ARRD/BAL/ SEN/1 1991 6 Months Sholgra/ Balkh Construction of bridge Completed 
8 UNDP ARD/TKR /SEN/2 1991 8 Months Farkhar/ Taloqan Reconstruction of Farkhar-Taloqan road Completed 
7 UNDCP AFG/89/580/ PRB/ DCP/007 1991 5 Months Baharak/ Badakhshan Reconstruction of girls secondary school Completed 
6 UNDCP AFG/89/580/ PRB/DCP/006 1991 6 Months Jurm/ Badhakhshan Reconstruction of girls secondary school Completed 
5 UNDCP AFG/89/580/ PRB/DCP/005 1991 6 Months Faizabad/ Badakhshan Construction of boys primary school Completed 
4 UNDCP AFG/89/580/ PRB/DCP /004 1991 6 Months Faizabad/ Badakhshan Construction of boys primary school Completed 
3 UNDCP AFG/89/580/ SEN/DCP /002 1991 2 Months  Jurm/ Badhakhshan Rheabilitation of Sajad canal Completed 
2 UNDP AFG/88/001 SEN/APP/144 1991 8 Months Taloqan/ Takhar Establishment of rice seedproduction project Completed 
1 Canada Fund    1990 3 Months Sholgra/ Balkh Rehabilitation of Abdurahimzai Canal Completed